80 Cooper Street, Surry Hills
Centric Engineers’ mechanical team assessed the existing base building tenant condenser water system and assisted strata management with the refurbishment and upgrade of the existing equipment including cooling tower and pumps. Our team also provided design and documentation of the new supplementary air conditioning systems to serve the three office spaces on level 1.